Malden Center station
Malden Center | ||||||||||||||||
---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
General information | ||||||||||||||||
Location | Commercial Street at Pleasant Street Malden, Massachusetts | |||||||||||||||
Coordinates | 42°25′36″N 71°04′28″W / 42.426715°N 71.074349°W | |||||||||||||||
Line(s) | Haymarket North Extension Western Route | |||||||||||||||
Platforms | 1 side platform (Haverhill Line) 1 island platform (Orange Line) | |||||||||||||||
Tracks | 1 (Haverhill Line) 2 (Orange Line) | |||||||||||||||
Connections | MBTA bus: 97, 99, 101, 104, 105, 106, 108, 131, 132, 137, 411, 430 | |||||||||||||||
Construction | ||||||||||||||||
Structure type | Elevated | |||||||||||||||
Parking | 195 spaces ($7.50 fee) | |||||||||||||||
Bicycle facilities | 104 spaces in "Pedal and Park" bicycle cage | |||||||||||||||
Accessible | Yes | |||||||||||||||
Other information | ||||||||||||||||
Fare zone | 1A (Commuter Rail) | |||||||||||||||
History | ||||||||||||||||
Opened | December 27, 1975 (Orange Line)[1] | |||||||||||||||
Rebuilt | May 1, 1977 (Haverhill Line)[1] | |||||||||||||||
Passengers | ||||||||||||||||
2018 | 147 daily boardings[2] (Haverhill Line) | |||||||||||||||
FY2019 | 11,623 daily boardings[3] (Orange Line) | |||||||||||||||
Services | ||||||||||||||||
| ||||||||||||||||
| ||||||||||||||||
|
Malden Center station is a Massachusetts Bay Transportation Authority (MBTA) intermodal transit station in Malden, Massachusetts. Located on an elevated grade above Pleasant Street in downtown Malden, it serves the rapid transit Orange Line and the MBTA Commuter Rail Haverhill Line. The station has one island platform for the two Orange Line tracks and a single side platform for the single commuter rail track. Two busways are used by 12 MBTA bus routes.
The Boston and Maine Railroad opened through Malden in 1845. The original station was replaced in 1871, then again by a brick structure in 1892. The station building was sold for private use in 1958, but commuter trains continued to stop until the modern station opened in December 1975. Commuter trains stopped at the modern station from 1977 to 1979, and have stopped since 1985. A renovation in 2003–2005 added two elevators, making the station accessible.
Station layout
[edit]Malden Center station is located on an embankment on the west side of downtown Malden. The Orange Line is on the west side of the station, with two tracks and an island platform. The Western Route, used by the Haverhill Line, has one track and a single side platform on the east side. The fare lobby is under the center of the platforms, with entrances from both sides of the tracks. Malden Center is a major MBTA bus terminal serving routes 97, 99, 101, 104, 105, 106, 108, 131, 132, 137, 411, and 430. A two-lane busway used by most routes is located on the east side of the station, with a one-lane busway on the west side.[4]
History
[edit]The Boston and Maine Railroad (B&M) opened through Malden in July 1845.[5] The first station was a two-story wooden depot on the east side of the tracks at Pleasant Street; it was replaced by a smaller station on the west side in 1871.[6][7] In May 1891, the B&M began construction of a new station as part of a grade crossing elimination project.[8] The new station opened in 1892.[7] In 1958, the station building was purchased from the B&M for just $1,000 (equivalent to $10,600 in 2023). It was renovated for use as a restaurant and banquet hall, which opened by 1962.[9][10]
Malden Center station opened on December 27, 1975, as part of the MBTA's Haymarket North Extension of the Orange Line. Expansion to Malden had been a long-time goal of the Boston Elevated Railway, and the Everett extension of the Charlestown Elevated was originally planned to go past Everett and into Malden and Reading via Main Street. However, residents of Malden were opposed to the elevated railroad structure that was planned, and prevented the extension. The 1975 extension was built along the existing Western Route embankment rather than Main Street.
The former station platform closed simultaneously with the opening of the Orange Line station. A high-level platform - the first on the MBTA system - was installed along the Reading Line track, but Reading Line trains did not stop. The platform opened for regular service on May 1, 1977, but closed again on September 1, 1979.[1] On January 20, 1984, a fire destroyed the approach trestle to the Charles River Bridge at North Station; Haverhill Line trains were run to Oak Grove. North Station reopened on April 20, 1985; the commuter platform at Oak Grove closed but the platform at Malden was reopened.[1] The switch may have been made due to a request by John A. Brennan Jr., who was then constructing a large development near Malden Center station.[11]
Because of its Orange Line connection, Malden Center can serve as a temporary inbound terminus for the Haverhill Line when commuter rail service is disrupted between Malden and Boston's North Station. It served this role in 2016 during reconstruction work on the Woods Memorial Bridge, which carries the Revere Beach Parkway over the rail lines and the Malden River.[12] Oak Grove station is usually used during weekday disruptions, as it is closer to the double-track section of the line in Melrose.[1]
Renovations
[edit]Unlike most MBTA stations, air rights over the station are owned by the city rather than by the MBTA. By 1983, the city planned to build a footbridge to connect the station to nearby developments.[13] In 1989, the MBTA studied a possible accessible footbridge at the station, which would have cost $2.8 million and opened in 1991.[14]
The station was not initially accessible, but it was built with provisions for a future elevator.[15] The MBTA began a renovation of the station, then estimated to cost $6 million, in 2003.[16] It was originally to be completed in 2003, but was substantially delayed by changes to building codes.[17] Completed in 2005, the ultimately-$10 million project added a second exit stairwell and two elevators, making the station accessible.[18][19] In 2002, as part of its public art program, the MBTA added panels with artworks by local schoolchildren at Sullivan Square and Malden Center. The station also has two benches in the lobby painted by local arts students.[20][21]
Changes to wayfinding signage, lighting, and other station improvements were completed by May 2021.[22] The entire Orange Line, including Malden Center station, was closed from August 19 to September 18, 2022, during maintenance work. The Haverhill Line continued to stop at Malden Center during that time.[23] Rail service on the inner Haverhill Line was suspended from September 9 to November 5, 2023, to accommodate signal work.[24] The Encore Boston Harbor casino ran shuttles to Malden Center from its June 2019 opening until mid-2023.[25][26][27]
References
[edit]- ^ a b c d e Belcher, Jonathan. "Changes to Transit Service in the MBTA district" (PDF). Boston Street Railway Association.
- ^ Central Transportation Planning Staff (2019). "2018 Commuter Rail Counts". Massachusetts Bay Transportation Authority.
- ^ "A Guide to Ridership Data". MassDOT/MBTA Office of Performance Management and Innovation. June 22, 2020. p. 6.
- ^ "2025 System Map". Massachusetts Bay Transportation Authority. December 15, 2024.
- ^ Karr, Ronald Dale (2017). The Rail Lines of Southern New England (2 ed.). Branch Line Press. p. 292. ISBN 9780942147124.
- ^ "Malden". County Atlas of Middlesex Massachusetts. F.W. Beers & Co. pp. 111–112 – via Ward Maps.
- ^ a b Roy, John H. Jr. (2007). A Field Guide to Southern New England Railroad Depots and Freight Houses. Branch Line Press. p. 187. ISBN 9780942147087.
- ^ "Station begins to loom up". Boston Daily Globe. May 7, 1891. p. 5 – via Newspapers.com.
- ^ Glynn, Robert E. (October 6, 1962). "Passengers Will Find Gift Shops, Laundries Replacing Rail Depots". Boston Globe. p. 5 – via Newspapers.com.
- ^ Henry, Alan P. (August 10, 1977). "There's no depot like an old depot". Boston Globe. p. 3 – via Newspapers.com.
- ^ Mooney, Brian C. (October 23, 1988). "Malden senator has golden touch". Boston Globe. pp. 1, 52 – via Newspapers.com. (first page)
- ^ "Commuter Rail Service Alerts: Haverhill Line". Massachusetts Bay Transportation Authority. May 11, 2016. Archived from the original on May 19, 2016.
- ^ "T pushes development of its land to cut deficit". Boston Globe. January 29, 1983. p. 19 – via Newspapers.com.
- ^ Ackerman, Jerry (October 23, 1989). "Breakaway poles to be tried this week". The Boston Globe. p. 18 Metro – via Newspapers.com.
Separately, the MBTA hired Fay, Spofford & Thorndike Inc. of Lexington for a maximum of $146,000 to design a wheelchair-access pedestrian overpass at the Malden commuter-rail station. The authority estimates the overpass will cost $2.8 million and set a 1991 completion date.
- ^ Oak Grove Station, Malden. Massachusetts Bay Transportation Authority. March 1977.
At Malden Center Station provisions were made during construction for the installation of an elevator in the future.
- ^ Santoro, Phil (August 11, 2002). "T station to get $6m face lift". Boston Globe. p. 241 – via Newspapers.com.
- ^ Santoro, Phil (January 13, 2005). "Like travelers, projects not moving". Boston Globe. p. 115 – via Newspapers.com.
- ^ Tran Systems and Planners Collaborative (August 24, 2007). "Evaluation of MBTA Paratransit and Accessible Fixed Route Transit Services: Final Report" (PDF). Massachusetts Bay Transportation Authority. Archived from the original (PDF) on March 3, 2016. Retrieved October 1, 2014.
- ^ "Accessibility Projects at the MBTA" (PDF). Massachusetts Bay Transportation Authority. March 2005.
- ^ Durso, Holly Bellocchio (June 2011). Subway Spaces as Public Places: Politics and Perceptions of Boston's T (MCP). Massachusetts Institute of Technology. p. 62. hdl:1721.1/66801.
- ^ "On the Orange Line" (PDF). Massachusetts Bay Transportation Authority. pp. 6, 7.
- ^ Brelsford, Laura (May 24, 2021). "System-Wide Accessibility Initiatives—May 2021" (PDF). Massachusetts Bay Transportation Authority Department of System-Wide Accessibility. p. 5.
- ^ "A Rider's Guide to Planning Ahead: Upcoming Orange & Green Line Service Suspensions" (PDF). Massachusetts Bay Transportation Authority. August 2022.
- ^ "Service Disruption September 9 to November 5 on Haverhill Commuter Rail Line" (Press release). Massachusetts Bay Transportation Authority. August 10, 2023.
- ^ Miller, Joshua (June 20, 2019). "It's big, it's here, it's opening Sunday". The Boston Globe. p. A1 – via Newspapers.com.
- ^ "Encore Local Shuttle Service". Encore Boston Harbor. Archived from the original on May 14, 2023.
- ^ "Encore Local Shuttle Service". Encore Boston Harbor. Archived from the original on September 23, 2023.
External links
[edit]- Orange Line (MBTA) stations
- Railway stations in Middlesex County, Massachusetts
- Former Boston and Maine Railroad stations
- Railway stations in the United States opened in 1975
- MBTA Commuter Rail stations in Middlesex County, Massachusetts
- Buildings and structures in Malden, Massachusetts
- Bus stations in Middlesex County, Massachusetts